Those projects are very attractive for the potantial investors. Those farms will desribe practically zero costs of connections. The locations need only 15kV at a maximum 7km distance and this line will be connect to the exist 110/15 GPZ at the low part. That is way the only cost in that projects will be only the turbines. And this is the reason why those farms will turn the cost of invest two years faster then the farms with cost of construction own transformers etc. Till today we have
83,5 MW
The building permisionS we expect in april 2008.